: 2775 days (11.10.2018)

:


The finishing construction works on a new residential building in Burgas is underway. The construction project is located on a plot of 250 sq. m and has been planned with ground level, five floors and an attic level. The ground level is set with garages and outdoor parking spaces.

:
: 2 , 49 15.05.2026

:
: 2 , 54 15.05.2026

:
: 3 , 48 14.05.2026

72

19  ,