: 2684 days (11.10.2018)

:


The finishing construction works on a new residential building in Burgas is underway. The construction project is located on a plot of 250 sq. m and has been planned with ground level, five floors and an attic level. The ground level is set with garages and outdoor parking spaces.

:
: 2 , 32 13.02.2026

:
: 2 , 41 13.02.2026

:
: 3 days 12.02.2026

72

13  ,